Project d1_integration_Stage_func_ALL
Triggers a run of most of the functional tests. Many can run in parallel, but d1_integration_DEV2_sysmeta_sync functional needs to be run by itself (since it disables sync on an MN, and re-enables it after, and so could interfere with other tests). d1_integration_DEV2_registerister_functional however is not included in these tests since it requires a manual cleanup step in LDAP afterward.
Workspace | |
Recent Changes |
Downstream Projects
- d1
_integration _Stage _CN _diagnostics _functional - d1
_integration _Stage _CN _sid _functional - d1
_integration _Stage _CN _view _functional - d1
_integration _Stage _MN _sid _functional - d1
_integration _Stage _cn _v2 - d1
_integration _Stage _log _functional - d1
_integration _Stage _mn _package _functional - d1
_integration _Stage _mn _v2 - d1
_integration _Stage _mn _view _functional - d1
_integration _Stage _v1 _v2 _interop _functional